Cooperation mode
Cooperation advantage
JIEKAI
High electricity savings rates are achieved while maintaining constant parameters such as flow rate, head, and pressure, thereby maximizing system energy efficiency.
JIEKAI
Save the costs related to equipment maintenance, and provide quality assurance and after-sales service for the transformation part;
JIEKAI
Extend the service life of equipment, "tailor-made" equipment is processed with corresponding materials and advanced technology according to the actual working conditions, and the service life will be greatly extended;
JIEKAI
To reduce noise pollution, the modified circulating water system not only saves electric energy, but also greatly reduces the noise pollution generated during the operation of the pump;
JIEKAI
Zero investment, the customer does not need to invest any cost in the early stage of energy contract management, and Jie is responsible for the equipment and maintenance costs.
Cooperation process
01
Data acquisition (maximum operating condition) Check and inspect the site environment and equipment
···
02
Analyze energy consumption
···
03
Design energy saving scheme Measure and calculate the power saving rate and input cost
···
04
Technical exchange
···
05
Business negotiation
···
06
Contract signing
···
07
Custom equipment
···
08
Installation and acceptance
···
Cooperation cycle
JIEKAI
Data acquisition
1 month
···
JIEKAI
Scheme design
Half a month
···
JIEKAI
Business negotiation
According to the actual situation
···
JIEKAI
Water pump customization
2 ~ 4 months
···
JIEKAI
Installation of water pump
1~2 months
···